Starting a pool the right way protects surfaces, equipment, and your wallet. We follow builder/manufacturer guidelines to establish stable, LSI‑balanced water, with proper brushing, filtration, and chemistry from the start. With 15 years of pool experience, we deliver smooth startups without guesswork.
Experienced technicians who understand surfaces, chemistry, and hydraulics — not guesswork.
We follow the startup method recommended for your surface and equipment.
Proper startup prevents scale, etching, and premature equipment wear.
Straightforward updates, notes, and easy call/text support.
Starting at $500
2–3 visits covering initial balance, brushing, filtration, and confirmation.
Starting at $550
Structured program through the first 2–4 weeks with brushing, balancing, and filter service. Also, manually vacuuming plaster dust to waste.
Starting at $365
Post‑cure evaluation, chemistry check, salt addition, and controller setup.
Note: Pricing varies by pool size, surface, and condition. Written estimates provided before work.
Primary Startup Service Area (3‑mile radius of Yuma 85367):
If you’re just outside the radius, call or text — we’ll do our best to accommodate.
Guidance on fill, equipment start, initial testing, and safety checks. Begin pH/alkalinity control and set filtration.
Daily brushing, re‑test/re‑balance, monitor pressure, backwash/clean filter as needed.
Dial in chemistry targets, continue brushing, ensure clarity and circulation performance.
Fine‑tune calcium hardness and CYA; verify sanitizer stability and LSI near neutral.
Confirm clarity and balance; prep for salt activation if applicable; provide care notes.
We respond fast—so your pool issues are solved before they become costly problems.
Our certified team uses advanced leak detection technology for accurate results every time
Upfront, honest pricing with no hidden fees. Get expert service that fits your budget.
Your Questions, Answered
Drain/refill startups typically take about a week; new plaster programs run 2–4 weeks.
Yes. We follow the specific startup method they require (e.g., acid or bicarbonate approach).
After chemistry is stable and the surface is ready, per builder guidance.
Typically after a cure period of ~28–30 days for new plaster; we’ll confirm based on your builder’s instructions.